
Farmington, Utah
Farmington is the county seat, and its building department runs out of City Hall on Main Street. This page covers how to permit a basement there, what the east bench teaches about water, and what a finish costs.
Free Estimate
Answer a few quick questions about your project and we will call you with next steps. No cost and no obligation.
Free Estimate in 7 Quick Questions
Cost
Basement finishing in Farmington typically falls between $55 and $85 per sq. ft. Size, the number of bathrooms and the finish level set where you land. Full custom remodels can run $80,000–$150,000+, and our own finishes start around $50 per square foot.
A clean, functional finish for an unfinished basement: framing, insulation, drywall, flooring, lighting and the essential rooms.
Good foundation for future upgrades
For Farmington: a large family room, two bedrooms and a full bath, often with a small kitchenette.
Strong equity return for most homes
Higher-end finishes, specialty rooms and more complex builds. Scope varies a lot with the goals, so these are always custom scoped.
Custom scoping recommended
These are Pro-Worx's typical ranges. The number for your Farmington home depends on size, materials and structural details, and we give a precise quote after seeing the space.
| Add-On | Typical Cost |
|---|---|
| Adding a bathroom | $8,000 – $18,000 |
| Each egress window | $3,000 – $7,500 |
| City permit fees | Calculated by the Building Department from the application |
New circuits are designed to the 2023 National Electrical Code, which Farmington lists in its design criteria. That affects where arc-fault and ground-fault protection is required.
A kitchenette adds plumbing and dedicated circuits. We price it as an option so you can see the difference.
Is It Worth It?
On national cost-versus-value figures a basement finish recovers around 71 percent at sale. Farmington homes tend to be large, so an unfinished lower level is a lot of unused square footage.
What returns the most in Farmington
What returns less on its own
Source: national basement finishing cost-vs-value data. National averages. Individual results vary by market conditions and execution quality.
If you plan to rent the level later, tell us at the start. An accessory apartment has its own city requirements and is easier to design in than to add.

Permits
Yes. Davis County's permit guidance lists basement finishes among work that needs a building permit, and Farmington issues its own. Permit packets are available at City Hall, 160 South Main, or from the city's website.
What Farmington asks for
Farmington publishes its design criteria: the 2021 International Residential Code, 2021 mechanical, plumbing and energy codes, and the 2023 electrical code. We draw to those editions so review comments are few.

East Bench Water
Farmington's east side is built on the fans below steep canyons. The Utah Geological Survey records what happened there in the wet spring of 1983.
| Fact | Detail |
|---|---|
| Event | The 1983 Rudd Canyon debris flow. |
| Volume | About 90,000 cubic yards of sediment deposited on the alluvial fan. |
| Damage | 35 houses damaged and an estimated $3 million in property damage. |
| Source | Utah Geological Survey, debris-flow hazards. |
A basement finish does not change that hazard. The lesson we take from it is narrower: on the bench, know where surface water goes before you put carpet and drywall below grade.
Moisture & Radon
Conditions differ across the city. The bench deals with runoff from above, while lower ground toward the bay can hold water in the soil longer. Each house gets its own check.
Before any framing goes up
UtahRadon.org data for 2015 to 2025 shows 46 percent of tested Davis County homes at or above the World Health Organization's 2.7 pCi/L threshold. Mitigation is simplest when the vent is routed before walls are closed.
Timeline
Most Farmington basement finishes are done in 6–10 weeks. Bigger footprints with a kitchenette, theater or guest suite take 10–14 weeks.
| Scope | Typical Timeline |
|---|---|
| Most basement finishes | 6–10 weeks |
| Larger remodels with custom features (theaters, bars, in-law suites) | 10–14 weeks |
Before the build
Permit packet filed with the Farmington Building Department
First stage
Walls, electrical, plumbing and HVAC go in before anything is covered
Staged throughout
Rough and final inspections under the 2021 codes
Main stage
Most of the visible change happens in this stretch
Last step
Punch list, warranty paperwork and handover
Best Layout
With more square footage the risk is a maze of halls. Keep one generous open room and hang the others off it.
A walkout or daylight wall, where you have one, should serve the family room. It is the only place a basement gets real sun.

Farmington homeowners also hire us for work above the basement.



We offer a full range of premium renovation services to Farmington homeowners. Each service is tailored to your home's unique architecture, your personal style, and your budget.

Transform your unfinished basement into a stunning living space: home theaters, gyms, offices, or guest suites crafted with premium materials and expert craftsmanship.
Basement Finishing in Farmington
Accessory dwelling units built to be legal and rentable: basement and garage conversions, attached units and new detached backyard homes, permitted from start to finish.
ADU Building in Farmington
Custom homes built around how you live, from a bare lot or a full rebuild: your floor plan, your finishes, managed by licensed Utah contractors.
Custom Home Builds in Farmington
Custom cabinetry, premium countertops, and designer layouts that make your kitchen the heart of the home. Full-service kitchen renovations from concept to completion.
Kitchen Remodeling in Farmington
Spa-inspired bathrooms with luxury fixtures, custom tile work, and elegant finishes. From master baths to powder rooms, we create beautiful, functional spaces.
Bathroom Renovation in Farmington
Purpose-built home gyms with reinforced flooring, proper ventilation, mirror walls, and equipment-ready electrical: your personal fitness space designed for performance.
Home Gym in Farmington
Immersive home theater experiences with acoustic treatments, tiered seating, custom lighting, and integrated A/V systems built for cinematic entertainment.
Home Theater in Farmington
Productive, professional home offices with built-in desks, custom shelving, soundproofing, and dedicated electrical circuits for your remote work needs.
Home Office in Farmington
Expand your living space seamlessly with expertly designed room additions, bump-outs, and second-story additions that match your home's character.
Home Additions in Farmington
Self-contained guest suites and in-law apartments with private entrances, kitchenettes, and full bathrooms: comfortable, independent living spaces.
Guest Suite in Farmington
Custom wet bars and kitchenettes with premium countertops, cabinetry, sinks, and beverage refrigerators: perfect for entertaining and everyday convenience.
Wet Bar & Kitchenette in Farmington
Complete home renovation services including whole-home transformations designed around your lifestyle and built to last with premium materials.
Home Remodeling in Farmington
Custom entertainment and game rooms designed for fun: pool tables, arcades, shuffleboard, lounge seating, big-screen TVs, and ambient lighting that bring your home to life.
Game Room in Farmington
Attached and detached garage additions, from two-car expansions to luxury four-car builds with workshop space, lofts, and finished interiors that match your home.
Garage Addition in FarmingtonLarge basements reward careful planning.
We design to the code editions Farmington publishes, including the 2023 electrical code.
Grading, sump and slab are checked and fixed before framing starts.
Kitchenette, theater and extra bath are shown as line items so you choose with real numbers.
In Farmington we sort out water first and drawings second.
Grading, downspouts, sump and slab are inspected before any design work.
A plan for the full footprint, with the kitchenette, theater or extra bath priced separately.
The packet goes to the Farmington Building Department, drawn to the code editions the city lists.
Rough and final inspections, then a walkthrough and warranty.
From the Farmington Building Department at City Hall, 160 South Main. Permit packets can be picked up there or downloaded from the city's website.
The city lists the 2021 International Residential Code, 2021 mechanical, plumbing and energy codes, and the 2023 National Electrical Code in its design criteria.
The 1983 Rudd Canyon flow damaged 35 houses on the east bench, according to the Utah Geological Survey. Risk depends on the lot, so ask the city about yours if you are near a canyon mouth.
Typically $55 to $85 per square foot. Our finishes start around $50 per square foot and large custom projects can reach $80,000 to $150,000 or more.
Six to ten weeks for most finishes, and ten to fourteen for larger projects with custom features.
Yes. It needs plumbing and dedicated circuits, and we price it as an option. If you intend to rent the space, tell us first, because an accessory apartment has separate city rules.
We will check drainage, draw to the city's codes and price your options.
Call us at (801) 888-4282 or fill out our online form for a free estimate.