ADU Laws in Utah: What Homeowners Need to Know
Utah's accessory dwelling unit rules, zoning requirements and permit steps, explained for homeowners.
Read More
Utah ADU Builders
Turn a basement, a garage or part of your backyard into a legal, rentable living unit. We handle the design, the permit and the build.
Free Estimate
Answer a few quick questions about your ADU building and we will call you with next steps. No cost and no obligation.
Free Estimate in 7 Quick Questions
About This Service
An accessory dwelling unit is a second, self-contained home on your lot: its own entrance, kitchen, bathroom and sleeping space. Pro-Worx Construction builds all three kinds. We convert basements and garages, we build units attached to the main house, and we build new detached units from the foundation up.
Utah law has moved in homeowners' favor. An internal ADU, such as a basement apartment, has been a permitted use in residential zones statewide since 2021. From October 1, 2026, a newer state law also requires most larger cities to allow a detached ADU on qualifying single-family lots. Cities still set their own conditions, so the first thing we do is read your city's current ordinance.
A converted basement adds space. A properly permitted ADU adds a unit you can legally rent or hand to family. The difference is in the details: egress, fire separation, a separate entrance, parking, and sometimes separate utility metering. We plan those before design, not after framing.
Project Gallery
Every detail reflects our commitment to quality. Browse photos of ADU building work.


The Pro-Worx Difference
We check your city's ADU ordinance first, then pull the permit and build to it, so the unit can be rented without a compliance problem later.
Basement and garage conversions, attached units and new detached builds, handled by one contractor from foundation to finish.
Kitchen, bath, storage and entrance are laid out around how a long-term tenant or a family member will actually live there.
You get a written scope and price after we review the property, with no vague allowances.
We schedule around your city's permit process and tell you up front how long each stage should take.
Whether it is for aging parents, an adult child or a tenant, we design for privacy on both sides of the wall.
Comprehensive Service
Every Pro-Worx project includes meticulous attention to detail, premium materials, and expert craftsmanship. Here's what you can expect when you work with us:
Request a Custom QuoteRelated Project Examples
Explore related project examples, or browse our full portfolio of completed builds across Utah.
Our Process
A clear, transparent process from first call to final walkthrough.
We look at your lot, your existing space and your city's current ADU rules to see which type of unit you can build.
We lay out the unit, choose the entrance and egress, and give you a written scope and price.
We prepare and submit the application, plus any registration or owner-occupancy paperwork your city requires.
Conversions run through framing, rough-in and finishes. Detached units start with the foundation and utility connections.
We close out every inspection and hand over a unit that is permitted, finished and ready to occupy.
FAQ
For internal ADUs, almost certainly. Utah Code makes an internal accessory dwelling unit, such as a basement apartment, a permitted use in areas zoned primarily for residential use. For detached ADUs, a state law taking effect October 1, 2026 requires most larger Utah cities to allow one on qualifying single-family lots. Cities can still set conditions, so we confirm your city's ordinance before designing anything.
S.B. 284, passed in the 2026 session and effective October 1, 2026, limits how cities can regulate detached ADUs. It applies to cities above a population threshold, covers lots of 11,000 square feet or more that have a single-family home, and stops a city from requiring more than one on-site parking space for a detached unit under 650 square feet. Many cities have been rewriting their ordinances to comply, so check the current local rules for your address.
In most cases, yes, subject to your city's rules. State law lets cities require a permit or license, require that the owner live in the main home, require one additional parking space, and prohibit rentals shorter than 30 days. We confirm what applies to you as part of planning.
It depends on the type. A detached garage-based ADU with a full kitchen, bathroom and separate entrance typically runs $100,000 to $200,000. A full attached or new detached ADU generally runs $200,000 to $300,000. A basement conversion costs less because the structure already exists. These are typical ranges, and we give a precise quote after reviewing your property.
A basement or garage conversion typically takes 8 to 14 weeks. A new detached ADU, including foundation work, generally takes closer to 4 to 6 months, depending on scope and your city's permit timeline.
Any bedroom in an ADU needs a code-compliant egress opening, whatever the type of unit. We handle egress installation and permitting as part of the project.
Yes. We offer financing options for ADU projects. Ask about the available plans during your free consultation.
Areas We Serve
We provide expert ADU building services throughout Utah's most desirable communities.
Resources
Expert insights to help you make informed decisions about your ADU building project.
Utah's accessory dwelling unit rules, zoning requirements and permit steps, explained for homeowners.
Read MoreHB 82 gives you the right but not the building code shortcut. See the drywall, fire door, separate entrance rules for a legal Utah IADU in 2026.
Read MoreThinking of a basement rental in Utah? Discover the 2026 legal requirements for Utah I-ADUs and the real ROI of a guest suite vs. a legal apartment.
Read MoreLet's Get Started
Tell us about your property. We will check what your city allows and give you a written scope and price.