
South Jordan, Utah
South Jordan hands homeowners a checklist. The city publishes a Basement Finish Code Requirements sheet and a Basement Plan Review form, and plans that follow them tend to pass. Add an HOA in many neighborhoods, and the job is mostly about preparation.
Free Estimate
Answer a few quick questions about your project and we will call you with next steps. No cost and no obligation.
Free Estimate in 7 Quick Questions
Cost
Costs vary depending on basement size, condition, and the finishes you choose. In South Jordan, finishing typically ranges from $55–$85 per sq. ft., while full remodels with custom upgrades may range from $80,000–$150,000+. Our own finishes start around $50 per square foot.
A clean, functional finish for an unfinished basement: framing, insulation, drywall, flooring, lighting and the essential rooms.
Good foundation for future upgrades
The typical South Jordan finish: a bedroom, bath, family room and a flex room for an office or gym.
Strong equity return for most homes
Higher-end finishes, specialty rooms and more complex builds. Scope varies a lot with the goals, so these are always custom scoped.
Custom scoping recommended
These are Pro-Worx's typical ranges. The number for your South Jordan home depends on size, materials and structural details, and we give a precise quote after seeing the space.
| Add-On | Typical Cost |
|---|---|
| Adding a bathroom | $8,000 – $18,000 |
| Each egress window | $3,000 – $7,500 |
| City permit fees | Quoted by the city's building department |
HOA review does not cost much, but it takes time. Submitting to the architectural committee in parallel with the city avoids waiting twice.
Townhomes and smaller-lot homes have compact basements, where built-ins and good lighting matter more than square footage.
Is It Worth It?
A basement finish recoups 70 to 75 percent on national averages. In planned communities where homes are similar, a finished basement is one of the few ways to stand out at sale.
What returns the most in South Jordan
What returns less on its own
Source: national basement finishing cost-vs-value data. National averages. Individual results vary by market conditions and execution quality.
Keep the city's sign-offs and the HOA approval letter together. Buyers' agents in these communities ask for both.

Permits
Yes. South Jordan's building page provides a Basement Finish Code Requirements checklist and a Basement Plan Review form, and the building department can be reached at 801-446-4357.
What South Jordan asks for
A published checklist removes the guesswork. We go through it line by line on the drawings, which is the simplest way to avoid correction notices.

HOA & Groundwater
Two things: many homes are in associations with design review, and parts of the city have documented shallow groundwater. The Utah Geological Survey investigated basement flooding in homes along 11800 South between 3600 and 4000 West.
| Item | What to do |
|---|---|
| HOA covenants | Read them before design. Window wells, exterior doors and walkouts usually need approval. |
| UGS hazard maps | The western Salt Lake Valley maps cover parts of South Jordan, including shallow groundwater. |
| Sump and drains | Confirm they exist and work before finishing over the slab. |
| Problem soils | The same maps show collapsible and expansive soils. |
Neither is a barrier. An HOA wants to see the exterior stay consistent, and groundwater wants somewhere to go. Plan for both early and they cost very little.
Moisture & Radon
The Utah Geological Survey treats groundwater within about 10 feet of the surface as shallow. Where that applies, a finished basement depends on its drainage.
Before any framing goes up
UtahRadon.org test data from 2015 to 2025 shows 45 percent of tested Salt Lake County homes at or above the World Health Organization's 2.7 pCi/L threshold. The UGS west valley maps also rate indoor radon potential, so you can see your area's rating before testing your own home.
Timeline
Most basement finishing projects in South Jordan are completed within 6–10 weeks. Larger remodels that include features like theaters, wet bars, or full guest suites may take 10–14 weeks. We'll provide a clear schedule upfront so you'll always know what to expect. Start HOA review early so it runs alongside the city's.
| Scope | Typical Timeline |
|---|---|
| Most basement finishes | 6–10 weeks |
| Larger remodels with custom features (theaters, bars, in-law suites) | 10–14 weeks |
Before the build
City checklist and plan review form, with HOA review in parallel
First stage
Walls, electrical, plumbing and HVAC go in before anything is covered
Staged throughout
Inspections against the published code requirements
Main stage
Most of the visible change happens in this stretch
Last step
Punch list, warranty paperwork and handover
Best Layout
These basements were drawn by the builder with a finish in mind. The best layouts follow that intent and add one room that can change jobs over time.
In compact basements we use glass doors and continuous flooring to keep sight lines long and the space feeling larger.

South Jordan's newer homes get upgraded on every floor.


Counters, cabinetry and lighting beyond the builder package.
Explore Kitchen Remodeling
A large share of South Jordan is Daybreak, Utah's largest master-planned community at over 4,100 acres and heading toward 20,000 homes. It's genuinely unusual among Utah HOAs: exterior work of almost any kind, from repainting to fencing to additions, requires Design Review Committee approval before you start, with specific material and color rules spelled out in detail. If you're outside Daybreak, none of this applies and standard South Jordan zoning covers your project instead.
Daybreak's official Architectural Guidelines are specific about what can and can't be used on exterior surfaces:
Source: Daybreak Community Association official Design Guidelines , updated March 2025. Rules can change; always confirm the current version before finalizing a design.
We check Daybreak's current material guidelines before specifying any exterior product for a project there, since a beautiful, code-compliant siding choice can still get rejected if it's on the restricted list.
Not without going through the approval process first, if you're changing colors. Repainting in the exact same existing colors and pattern doesn't require approval, but any color change does, and the requirements are specific:
A full colored exhibit showing front, side, and rear elevations with all proposed colors labeled
Documentation showing no similar colors exist on nearby homes in the same view corridor
All color and application details approved before any painting begins
This level of detail is unusual even by HOA standards, and it's specific to Daybreak rather than typical of South Jordan generally. Skipping this step is one of the most common ways Daybreak homeowners run into fines or forced corrections.
Daybreak sits on land formerly owned by Kennecott Copper, remediated years before any homes were built, and became a nationally recognized template for redeveloping former mining company land into planned residential communities.
Source: National Association of Home Builders case study on Daybreak .
That planned-community scale is exactly why the design guidelines are so specific, the goal from day one was visual consistency across a community this size.
Before anything else, ask a contractor:
Is your home inside Daybreak, or elsewhere in South Jordan under standard zoning?
If it's in Daybreak, do they know the current Design Guidelines and restricted materials?
Have they built in Design Review Committee approval time before construction starts?
Starting exterior work in Daybreak without DRC approval isn't a minor paperwork issue, it can mean fines and a forced redo.
Tell us if you're in Daybreak or elsewhere in South Jordan, and we'll build the right approval process into your project from day one.
No, purely interior work doesn't require DRC approval in Daybreak. It's specifically exterior changes and anything visible from a public street or common area.
Applications must be complete at least a week before the committee's meeting, and high application volume can push actual approval further out. We build this timeline into project planning.
It can be cited as a violation and result in fines from the Association, and you may be required to undo the work.
No, they're specific to the Daybreak Community Association. Homes elsewhere in South Jordan follow standard city zoning without Daybreak's additional design review layer.
Generally yes, though placement and appearance are subject to Design Review Committee approval, and Utah's solar access laws limit how much an HOA can restrict solar specifically.
Renovating in South Jordan isn't just about updating looks, it's about improving how your home functions, increasing resale potential, and keeping up with the high standards of this thriving Salt Lake County community. With many homes in areas like Daybreak and Glenmoor built on larger lots and featuring unique layouts, remodels here often require thoughtful design and quality finishes that stand the test of time.
The actual price of your project will depend on your home's current layout, the materials you choose, and how extensive the changes are, especially if you're reconfiguring main living areas or finishing a basement. We provide clear, detailed estimates so you know exactly where every dollar goes.
Source: Zonda's 2025 Cost vs. Value Report
Final pricing depends on your home's current condition, the scope of work, materials and layout changes. We provide transparent, detailed estimates up front.
| Project Type | Typical Cost Range | ROI (Avg.) |
|---|---|---|
| Minor Kitchen Remodel | $35,000 – $55,000 | Up to 112.9% |
| Upscale Kitchen Remodel | $80,000+ | ~38% |
| Midrange Bathroom Remodel | $20,000 – $35,000 | ~66% |
| Whole-Home Renovation | $150,000 – $350,000+ | Varies |
| Home Addition | $200–$350 per sq. ft. | ~50–60% |
ROI figures: Zonda's 2024 Cost vs. Value Report.
"I really appreciated their knowledgeable suggestions and the extra effort they took to get just what we wanted."
Kelly Sparks
Google review
We offer a full range of premium renovation services to South Jordan homeowners. Each service is tailored to your home's unique architecture, your personal style, and your budget.

Transform your unfinished basement into a stunning living space: home theaters, gyms, offices, or guest suites crafted with premium materials and expert craftsmanship.
Basement Finishing in South Jordan
Accessory dwelling units built to be legal and rentable: basement and garage conversions, attached units and new detached backyard homes, permitted from start to finish.
ADU Building in South Jordan
Custom homes built around how you live, from a bare lot or a full rebuild: your floor plan, your finishes, managed by licensed Utah contractors.
Custom Home Builds in South Jordan
Custom cabinetry, premium countertops, and designer layouts that make your kitchen the heart of the home. Full-service kitchen renovations from concept to completion.
Kitchen Remodeling in South Jordan
Spa-inspired bathrooms with luxury fixtures, custom tile work, and elegant finishes. From master baths to powder rooms, we create beautiful, functional spaces.
Bathroom Renovation in South Jordan
Purpose-built home gyms with reinforced flooring, proper ventilation, mirror walls, and equipment-ready electrical: your personal fitness space designed for performance.
Home Gym in South Jordan
Immersive home theater experiences with acoustic treatments, tiered seating, custom lighting, and integrated A/V systems built for cinematic entertainment.
Home Theater in South Jordan
Productive, professional home offices with built-in desks, custom shelving, soundproofing, and dedicated electrical circuits for your remote work needs.
Home Office in South Jordan
Expand your living space seamlessly with expertly designed room additions, bump-outs, and second-story additions that match your home's character.
Home Additions in South Jordan
Self-contained guest suites and in-law apartments with private entrances, kitchenettes, and full bathrooms: comfortable, independent living spaces.
Guest Suite in South Jordan
Custom wet bars and kitchenettes with premium countertops, cabinetry, sinks, and beverage refrigerators: perfect for entertaining and everyday convenience.
Wet Bar & Kitchenette in South Jordan
Complete home renovation services including whole-home transformations designed around your lifestyle and built to last with premium materials.
Home Remodeling in South Jordan
Custom entertainment and game rooms designed for fun: pool tables, arcades, shuffleboard, lounge seating, big-screen TVs, and ambient lighting that bring your home to life.
Game Room in South Jordan
Attached and detached garage additions, from two-car expansions to luxury four-car builds with workshop space, lofts, and finished interiors that match your home.
Garage Addition in South JordanPreparation is what makes a South Jordan project quick.
Every line of the code requirements sheet is addressed on the plans.
We prepare the architectural review submission along with the permit.
We look at the maps and the sump before recommending a floor.
South Jordan's valley location allows for year-round interior construction. The city's busy development schedule means contractor availability fluctuates, booking 4–6 weeks ahead ensures your project stays on your timeline.
South Jordan publishes its checklist, and many homes have an HOA. We run both tracks at once.
We measure the basement and read your HOA documents for anything that affects window wells or doors.
Drawings address each line of the Basement Finish Code Requirements sheet, with the plan review form completed.
Both submissions go in at the same time so you only wait once. Then we build.
You receive the city sign-offs and the HOA approval letter in one package.
Yes. The city's building page offers a Basement Finish Code Requirements checklist and a Basement Plan Review form.
Interior work usually does not need it, but anything visible outside, such as window wells or a walkout, often does. Check your covenants.
In places. The Utah Geological Survey investigated shallow groundwater flooding basements along 11800 South, and its west valley hazard maps cover parts of the city.
The building department quotes it for your project. Call 801-446-4357 for current fees.
If it has a code-size egress window, a closet where expected and meets the other bedroom requirements, yes.
Yes, we're familiar with South Jordan's HOA and community guidelines. Our team manages the paperwork and approval process to ensure your basement project meets all requirements before construction begins.
Most home remodeling projects in South Jordan take between 8 to 16 weeks, depending on the size and complexity of the renovation. We'll provide you with a customized timeline during your consultation so you'll know exactly what to expect.
City checklist, HOA review and a fixed price, handled together.
Call us at (801) 888-4282 or fill out our online form for a free estimate.